West Gate Bridge | |
---|---|
View of the bridge with a River Cruise Boat passing under |
|
Official name | The western highland gate bridge |
Carries | 10 lanes (5 inbound, 5 outbound) (After expansion) |
Crosses | Yarra River |
Locale | Melbourne, Australia |
Maintained by | VicRoads |
ID number | WGB |
Design | Cable-stayed box girder |
Total length | 2,582.6 metres (8,473.1 ft) |
Width | Maximum of 37.3 metres (122.4 ft) |
Longest span | 336 metres (1,102 ft) |
Clearance below | 58 metres (190.3 ft) |
Opened | 15 November 1978 |
Daily traffic | 165,000[1] |
Connects the Melbourne CBD with south-western suburbs and Geelong | |
|
The West Gate Bridge is a steel box girder cable-stayed bridge in Melbourne, Victoria, Australia. It spans the Yarra River, just north of its mouth into Port Phillip, and is a vital link between the inner city and Melbourne's western suburbs with the industrial suburbs in the west and with the city of Geelong, 80 kilometres (50 mi) to the south-west.
The main river span is 336 metres (1,102 ft) in length, and the height above the water is 58 metres. The total length of the bridge is 2,582.6 metres (8,473.1 ft). It is the third longest in Australia behind the Houghton Highway and the Hornibrook Bridge, and is twice as long as the Sydney Harbour Bridge.
The bridge passes over Westgate Park, a large environmental and recreational reserve created during the bridge's construction.
Contents |
The West Gate Bridge carries five lanes of motor vehicle traffic in each direction.
The bridge was originally tolled. Tolls were abolished in 1985, because drivers were using other routes to avoid the toll.[2]
Cyclists are prohibited from using the bridge except for special bicycle events, notably the "MS Summer cycle" which is a fundraising event for multiple sclerosis and the "Around the bay in a day" Bicycle Victoria event that raises money for the charity The Smith Family. The Westgate Punt is a ferry that runs directly below the bridge taking cyclists and pedestrians across the Yarra between a jetty at Fishermans Bend near Westgate Park - Bay Trail and a jetty adjacent to Scienceworks Museum - Hobsons Bay Coastal Trail. Operating Monday to Friday in morning and evening peaks and on weekends and public holidays, 10:00 a.m. to 5:00 p.m. on demand.
Two years into construction of the bridge, at 11.50 am on 15 October 1970, the 112 m (367.5 ft) span between piers 10 and 11 collapsed and fell 50 m (164 ft) to the ground and water below. Thirty-five construction workers were killed. Many of those who perished were on lunch break beneath the structure in workers' huts, which were crushed by the falling span. Others were working on and inside the girder when it fell. The whole 2,000-tonne mass plummeted into the Yarra River mud with an explosion of gas, dust and mangled metal that shook buildings hundreds of metres away. Homes were spattered with flying mud. The roar of the impact, the explosion, and the fire that followed, could be clearly heard over 20 km away. A West Gate Bridge Memorial to workers who lost their lives is located near the bridge. On the following morning, 16 October, Sir Henry Bolte (Premier of Victoria) announced that a Royal Commission would be set up immediately to look into the cause of the disaster. The Prime Minister, Mr. John Gorton, said: "I am sure the whole of Australia is shocked and saddened by the serious accident at West Gate Bridge. Please extend my deepest sympathy to all those families to whom this tragic event has brought such grief."[3]
A Royal Commission into the collapse was established, and concluded on 14 July 1971. It attributed the failure of the bridge to two causes: the structural design by designers Freeman Fox & Partners and an unusual method of erection by World Services and Construction, the original contractors of the project.
On the day of the collapse, there was a difference in camber of 11.4 centimetres (4.5 in) between two half-girders at the west end of the span which needed to be joined. It was proposed that the higher one be weighted down with 10 concrete blocks, each 8 tonnes (11 t), which were located on site. The weight of these blocks caused the span to buckle, which was a sign of structural failure. The longitudinal joining of the half girders was partially complete when orders came through to remove the buckle. As the bolts were removed, the bridge snapped back and the span collapsed.
Six twisted fragments of the collapsed bridge can be found adorning the gardens in the engineering faculty of Monash University, Clayton campus. It is said by students that they are to remind engineers of the consequences of their errors. Monash University acquired these when asked to participate in the investigation of the collapse.
Construction resumed in 1972, with the bridge being completed in 1978. After 10 years of construction, the bridge, a part of the larger West Gate Freeway, cost $202 million.[2]
In 2003 speed cameras were erected on the bridge, but were not activated until September 2005, because of issues with a similar camera on the Western Ring Road.[4] However these speed cameras were switched off in 2005, and currently remain disabled, as the sway of the bridge prevents secondary verification of the alleged speed against a fixed point.[5] In 2006 the State Government spent $1.3 million on erecting railway style boom barriers at each entrance to the bridge to block traffic in the event of a terrorist attack.[6] In March 2007 the State Government announced that two flagpoles would be erected atop the main bridge pylons, to fly the Australian and Victorian flags, each being 10 metres by 5 metres in size and 135m above sea level.[7] Costing $350,000 to install and $15,000 a year to maintain,[8] the flags were unfurled on 24 September 2008.[9]
On 5 August 2007 it was reported that the Victorian Government was planning a $240 million project to identify and eliminate structural weaknesses in the bridge, with specific concerns including crash barriers, cracking, corrosion and potential buckling. News of the work was prompted by the collapse of the I-35W Mississippi River bridge in Minneapolis, Minnesota, United States. Experts were reported as saying the West Gate was initially designed to carry loads of 25 tonnes but now carried B-double trucks weighing up to 68 tonnes. The bridge was built to carry 40,000 vehicles a day, but volumes are now more than four times the original amount, approximately 160,000 vehicles on an average day.[10]
On 17 May 2006, the State Government as part of their Meeting Our Transport Challenges plan announced plans to change traffic flow in peak periods on the West Gate Bridge and approaches to it, using a reversible lane to provide five traffic lanes in the peak direction, opposing traffic having three lanes.[11] This was to be done using overhead signals and barriers and the State Government allocated funds to this project in its 2006–2007 state budget, but the works were never carried out.
In 2008 the expansion plans were revised as part of the Victorian Transport Plan, when it was announced that the bridge would be widened to 5 lanes in each direction, the space being gained by narrowing the existing traffic lanes and closing the emergency lanes, in a move criticised by Victorian fire, police and ambulance unions.[12] Overhead gantries would be used to direct traffic out of lanes when breakdowns and accidents occur. Costed at $240 million, each lane would be 3.1 metres wide, by comparison lanes on the Sydney Harbour Bridge have a width of 2.8 metres.[12] Roads Minister Tim Pallas claimed that the plan would allow the bridge to carry 50 percent more vehicles, while reducing crashes by 20 percent.[13] Structural analysis work on the bridge concluded in early 2009 and was completed over a 14-month period. Works to strengthen the bridge commenced in the first half of 2009, with the entire strengthening project scheduled for completion in 2011.[14]
On the 22 June 2011 all five lanes were finally opened to the public in both directions, with the completion of the required strengthening works.[15] The full cost was $347 million, $107 million more than VicRoads had planned. This cost increase was after the deletion of $20 million decorative lighting originally included in the scope of the works.[15]
Strong growth in suburbs along the route, and increased freight through the Port of Melbourne, means that the corridor is experiencing traffic congestion during peak periods, is vulnerable to short term interruptions and is rapidly approaching capacity. Proposals to abate congestion by allowing more traffic have included bridge widening, a tunnel underneath the river, or adding a second deck to the bridge. Many such plans have come under fire from community groups such as the Public Transport Users Association and Environment Victoria advocating investment in alternative forms of transport.
A private sector report made public in February 2006 report suggested building a companion tunnel to the West Gate Bridge under the Yarra River. Made up of three separate bores to carry traffic in either direction and a freight rail line, the portals would have been north of Williamstown Road in Port Melbourne, and between Blackshaws and Melbourne roads in Altona North.[16][17]
The State Government also assessed options for the development of another east-west link in 2008. Sir Rod Eddington, former CEO of British Airways and Chairman of the Victorian Major Events Company, will head the assessment of the future East-West connections and recommend the best way forward for public transport, road and freight travel for the entire Monash-West Gate corridor. By December 2008 the State Government announced it was planning for such a link, anticipated to be a three kilometre road tunnel under Footscray and the Maribyrnong River. Linking Dynon and Footscray Roads in the Port of Melbourne precinct to Geelong Road in West Footscray, now known as the East-West road connection its cost is estimated at more than $2.5 billion.[18]
Police data show up to one suicide happens every three weeks at the West Gate Bridge. A 2004 coroner's report recommended anti-suicide fencing or barriers be erected on the bridge to deter people from taking their lives.[19] In 2008, the bodies of a mother in her late 20s and her 18-month-old baby were found on the river bank below the West Gate Bridge, prompting further calls to erect a suicide barrier.[20]
Those who argue for a suicide barrier claim that most of those who jump from the West Gate Bridge do so through impulse and that police officers who try to save those who try to jump are putting their own lives in danger. There are multiple incidents of police officers dangling off the side of the bridge while holding onto would-be jumpers.[21] A 2000 Royal Melbourne Hospital study on people who jumped from the bridge found at least 62 cases between 1991 and 1998. Seven people survived the 58-metre fall. Seventy-four percent of those who jumped from the bridge were male, with an average age of 33. More than 70 percent were suffering from mental illness.[22] Of those who jumped off the West Gate Bridge, 31 percent fell on land. Some of those who land in water drowned afterwards.[23]
In 2008, Melbourne girl, Darcy Freeman, was thrown off of the bridge by her father and later died in hospital. She was only 4 years old. Her father, Arthur Freeman, was subject to a custodial order and was deeply disturbed by the verdict. In April 2011, Freeman was found guilty of murder and sentenced to life in prison.
In February 2009 the first stage of a temporary suicide barrier was erected, constructed of concrete crash barriers topped with a welded mesh fence. By June that year it has been claimed that the fence has prevented two suicides.[24] Most of the second stage of the barrier has been completed throughout the span of the bridge. The barriers are costed at $20 million.[12]
|